Viscount GTE
Installation, Assembly and Servicing
Oil, Gas or Dual Fuel Fired Boilers
Assembly and Installation Instructions for Ideal Viscount Oil, Gas or Dual Fired heating boilers should be read in conjunction with the
general technical data tables enclosed and any other technical publication supplied with the burner.
CAUTION: To avoid the possibility of injury during the installation, servicing or cleaning of this appliance care should be taken when handling
edges of sheet steel components.
2
Ideal Viscount GTE
- Installation, Assembly & Servicing
Contents
1. General ........................................................................ 2
1.1 Technical Specifications of Combination Boilers .. 3
1.2 Main Dimensions .................................................. 4
2. Installing The Boiler ................................................... 5
2.1 Boiler Location ...................................................... 5
2.2 Ventilation ............................................................. 5
3. Assembly .................................................................... 5
4. Hydraulic Connections .............................................. 6
4.1 Dimensional Information Required ....................... 6
4.2 Installation Recommendations ............................. 6
4.3 Filling the System ................................................. 7
4.4 Sludge Removal ................................................... 7
5. Chimney Connection ................................................. 7
5.1 Flue Size ............................................................... 7
5.2 Connecting to the Flue ......................................... 8
6. Assembly of Viscount GTE Boilers .......................... 9
7. Control Panel ............................................................ 41
7.1 Standard ............................................................. 41
7.2 Deluxe ................................................................. 47
8. Fuel-Oil or Gas Connections .................................. 54
9. Servicing and Maintenance ..................................... 54
9.1 Cleaning .............................................................. 54
9.2 Cleaning the Casing Material ............................. 57
9.3 Precautions Required in the Case of Long ......... 57
Boiler Stops (one or more years)
9.4 Precautions Required if the Heating is ............... 57
Stopped when there is a Risk of Freezing
10. Burner Maintenance .............................................. 57
11. System Maintenance .............................................. 57
11.1 Water Level ....................................................... 57
11.2 Draining ............................................................. 57
12. Identification Plate ................................................. 57
1.
GENERAL
The boilers of the Viscount GTE range are pressurised hot water
boilers designed for connecting to a flue pipe which require a
separate automatic fuel-oil or gas burner. The heat output of
Viscount GTE boilers is between 754 and 1450 kW.
Models available :
·
Viscount GTE
Boiler with standard control panel designed to be connected
to the electrical cabinet.
·
Viscount GTE De Luxe
Boiler with "De Luxe" control panel, providing additional
features including running lights and extra wiring facilities.
Option Kits:
Flue Gas Thermometer
Pack ID28
Hour Run Meter
Pack IC8
M.T.H.W. Kit
Pack CM21
WARNING
The boiler shall be assembled and installed by a qualified professional only.
Strict compliance with these assembly, installation and maintenance instructions is a precondition for the correct
operation of the boiler
CONFORMITY / MARKING
This Product complies with the requirements of the following European directives and standards:
-
90.396 CEE Gas Appliance Directive Relevant standard : EN 303.1 / EN 303.2 / EN 304.
-
73.23 CDD Low Voltage Directive Relevant standard : EN 60.335.1.
-
89.336 CEE Electromagnetic Compatibility Directive Relevant standard : EN 50.081.1 / EN 50.082.1 / EN 55.014.
30
0
I
0
I
VIS5054
30
0
I
VIS5055
Ideal Viscount GTE -
Installation, Assembly & Servicing
3
1.1 Technical Specifications
Boiler:
Maximum operating pressure
:
6 bar
Maximum operating temperature
:
100ºC
Notes:
Fuel rates and flue gas data relate to maximum output ratings.
Gas firing data relates to the use of NATURAL GAS ONLY.
Details for the use of LPG are available on request from Caradon
Ideal Ltd.
The gas rate at calorific values differing from the standard quoted
above may be calculated by direct proportion. CALORIFIC VALUE:
38.5 MJ/m
3
(1,035 Btu/ft
3
).
Boiler thermostat setting 30 - 85ºC
Safety thermostat setting 110ºC
Boiler Size (no. of sections)
Maximum heat output
Minimum heat output
Boiler water content
Hydraulic resistance at 15K
Combustion chamber
Resistance (at zero draught)
Boiler Dry weight less
Burner unit
Maximum oil rate
Maximum flue gas volume (oil)*
Maximum gas rate
Maximum flue gas volume (gas)*
14
812
2770
754
2573
655
144
30
12
2.3
0.92
3217.5
7094.5
82.73
18.2
0.51
1081
84.4
2980
0.57
1208
15
870
2968
812
2770
693
152
34.7
13.8
2.4
0.96
3430
7563
88.64
19.5
0.55
1166
90.4
3192
0.61
1293
16
928
3166
870
2968
731
161
14
5.6
2.5
1
3629
8002
94.55
20.8
0.59
1250
96.4
3403
0.65
1377
17
986
3364
928
3166
769
169
15
6
2.6
1.04
3814
8410
100.5
22.1
0.62
1314
102.4
3616
0.69
1462
18
1044
3562
986
3364
807
177
17.5
7
2.7
1.08
3950
8710
106.4
23.4
0.66
1399
108.5
3831
0.73
1547
19
1102
3760
1044
3562
845
186
19
7.6
2.85
1.14
4127.5
9101
112.3
24.7
0.70
1483
114.5
4043
0.77
1632
20
1160
3958
1102
3760
905
199
21.5
8.6
3
1.2
4368.5
9632.5
118.2
26
0.73
1547
120.5
4255
0.81
1717
21
1218
4156
1160
3958
943
207
23.7
9.5
3.1
1.24
4567
10,070
124
27.3
0.77
1632
126.5
4466
0.85
1801
22
1276
4354
1218
4156
981
216
26
10.4
3.2
1.28
4755
10,485
130
28.6
0.81
1717
132.5
4678
0.89
1886
23
1334
4552
1276
4354
1019
224
28.3
11.3
3.3
1.32
4950.5
10,122
135.9
29.9
0.84
1780
138.6
4894
0.94
1992
24
1392
4749
1334
4552
1057
232
31
12.4
3.4
1.36
5140
11,334
142
31.2
0.88
1865
144.6
5106
0.98
2077
25
1450
4947
1392
4749
1095
241
33.5
13.4
3.5
1.4
5340
11,775
147.7
32.5
0.92
1950
150.6
5317
1.02
2162
kW
Btu/h x 10
3
kw
Btu/h x 10
3
I
gal
mbar
in.w.g.
mbar
in.w.g.
kg
lb
I/h
gal/h
m
3
/sec
ft
3
/min
m
3
/h
ft
3
/h
m
3
/sec
ft
3
/min
* 13% CO2 at 210C
* 9.5% CO2 at 210C
4
Ideal Viscount GTE
- Installation, Assembly & Servicing
GENERAL
1.2 Main Dimensions
Viscount GTE
Min. height for sweeping = 850
Flow detector
1566
543
496
370
Ø F
815
1080
200
420
616
R
791
565
17,5
S
3/4"
140
370
208
208
240
Max. 500
Max. 700
Burner centre line
610
U
B
M
H
K
Ø E
L
G
P
A
D
T
Ø E
300
223
100
C
741
11
7
2
The sizes are given in mm
Plain plate, requires cutting. Maximum
cut-out 500 x 700m
Length required for clearing the
water distributing tube
Dimension representing the end of the
100 mm long chimney connection
Note: with models 21, 22, 23, 24 and
25, a plain plate which must be cut out
is supplied without the 100 mm
chimney connection.
*
G =
**
VIS5056
A
(mm)
B (mm)
C (mm)
D (mm)
Ø
E (weld)
Ø
F (mm)
G (mm)
H (mm)
K** (mm)
L
(mm)
M (mm)
De Luxe
Standard
De Luxe
Standard
De Luxe
Standard
T
(mm)
U (mm)
GTE Boiler
1674
1744
1488
217
139.7
450
-
-2
10
2105
259
355
130
175
20
1760
1670
1483
2132.5
14
1785
1744
1488
188
139.7
450
150
-31
-19
2245
324
355
130
175
20
1760
1670
1594
2243.5
15
1896
1966
1488
189
139.7
450
150
-30
-18
2355
269
355
130
175
20
1760
1670
1705
2354.5
16
2007
1966
1488
210
139.7
500
370
-9
3
2445
321
355
130
175
20
1760
1670
1816
2465.5
17
21
18
2188
1504
236
159
500
370
-8
4
2555
265
355
130
175
20
1760
1670
1927
2576.5
18
2229
2188
1504
257
159
500
370
13
25
2645
299
355
130
175
20
1760
1670
2038
2687.5
19
2380
2450
1504
208
159
500
650
-36
-24
2845
269
355
130
175
20
1760
1670
2189
2838.5
20
2491
2450
1504
209
159
*
650
-35
-23
2955
324
355
130
175
20
1760
1670
2300
2949.5
21
2602
2672
1504
230
159
*
650
-14
-2
3045
269
355
130
175
20
1760
1670
241
1
3060.5
22
2713
2672
1504
231
159
*
980
-13
-1
3155
324
355
130
175
20
1760
1670
2522
3171.5
23
2824
2894
1504
252
159
*
980
8
20
3245
249
355
130
175
20
1760
1670
2633
3282.5
24
2935
2894
1504
253
159
*
980
9
21
3355
303
355
130
175
20
1760
1670
2744
3393.5
25
P
(mm)
R (mm)
S (mm)
Ideal Viscount GTE -
Installation, Assembly & Servicing
5
INSTALLATION
2.
INSTALLING THE BOILER
2.1 Boiler Location
For the assembly and because of their design, GTE boilers require
no special base or stand and their closed furnace system means
that the floor need not have refractory properties. All you have to
ensure is that the floor can support the weight of the boiler when it
is fitted for operation. If the boiler location is not determined precisely,
leave enough space around the boiler to facilitate monitoring and
maintenance operations.
B
L
M
C
A'
A
0.85 m
min.
0.281 m
1.566 m
1.172 m
0.195 m
Air outlet
Air inlet
VIS5057
2
1
300
Boiler
body
D min.
(1)
VIS5058
1.
Straight connection (not supplied)
2.
Angled connection (not supplied)
(1)
In order to facilitate subsequent work on the boiler
(replacing the water distributing tube etc.) use a flanged
connection from the boiler to the system, making sure you
comply with minimum clearance dimension D.
If A = 1.2 m (door opening side), A' = 0.5 m
If A = 0.5 m, A' = 1.2 m (door opening side) : adapt the dimensions
on the basis of the dimensions of the burner when the door is
open.
B = 1.5 m : adapt the dimensions on the basis of the dimensions
of the burner.
GTE
14
15
16
17
18
19
20
21
22
23
24
25
L
2105
2245
2355
2445
2555
2645
2845
2955
3045
3155
3245
3355
M
259
324
269
321
265
299
269
324
269
324
249
303
Cmin.
300
436
436
656
656
656
936
936
936
1266
1266
1266
Dmin.
-
136
136
356
356
356
636
636
636
966
966
966
2.2 Ventilation
The ventilation shall comply with applicable regulations, particularly
codes of practice.
Detailed recommendations for air supply are quoted in B.S. 6644.
Please note : remember that boilers installed in or close to rooms
in which the atmosphere is polluted with chlorine or fluorine
compounds may be subject to high corrosion.
For example : hairdressing salons, industrial premises (solvents),
cooling equipment, etc.
Boiler installed in such locations shall not be covered by the warranty.
6
Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
3.
ASSEMBLY
For boiler assembly refer to relevant later pages of this instruction book.
4.
HYDRAULIC CONNECTIONS
4.1 Dimensional Information Required
C
1080mm
200mm
H*
D
Heating return:
- 14 to 17 sections : 139.7 - 5"
- 18 to 25 sections : 159 - 6"
requires welding
Draining outlet
3/4" tap
Heating outlet:
- 14 to 17 sections : 139.7 - 5"
- 18 to 25 sections : 159 - 6"
requires welding
* dimension without connection
(see figure on page 5,
connection 1 or 2)
VIS5059
GTE
14
15
16
17
18
19
20
21
22
23
24
25
C (mm)
1488
1488
1488
1488
1504
1504
1504
1504
1504
1504
1504
1504
D (mm)
217
188
189
210
236
257
208
209
230
231
252
253
H (mm)
-2
-31
-30
-9
-8
13
-36
-35
-14
-13
8
9
4.2 Installation Recommendations
The installation of the boiler MUST be in accordance with the
following British Standards and Codes of Practice:
BS. 799 Pts. 4, 5, 6 & 7
Oil Burning Equipment
BS. 5410 Pts. 2 & 3
Installations for Space Heating and Hot
Water Supply
BS. 5449 PT. 1
Hot Water Systems
BS. 5854
Flues and Flue Structures in Buildings
BS. 5885 Pt. 1
Gas Burners - with outputs of 60kW
upwards
BS. 6644
Installation of Gas Fired Boilers
BS. 6880
Low Temperature Hot Water
Heating Systems
BS. 6891
Low Pressure Gas Pipework
British Gas
Industrial Gas Fired Boilers and
Publication No. IM.11
Air Heaters
General
Recommendations relating to the water system are contained in
BS. 5449 Pt. 1, BS. 1, BS. 5401 Pt.2, and BS. 6880.
The following must be conformed with:
Current Building Regulations and Clean Air Act
Water Authority Regulations
Local Authority Regulations and Regional bylaws
Gas Safety Regulations
Any special regional requirements of local Electricity and Gas
undertaking.
Fire Service and Insurance Company requirements.
All electrical wiring MUST comply with the current I.E.E. regulations
for the electrical equipment of buildings. In the interests of safety, a
competent installer should be employed to effect the installation of
the appliance. Manufacturer's notes must NOT, in any way, be taken
as over riding statutory obligations.
Ideal Viscount GTE -
Installation, Assembly & Servicing
7
ASSEMBLY
4.3 Filling the System
Filling shall be performed with a low flow rate from a low point in the
boiler room in order to ensure that all the air in the boiler is bled
from the high point of the system.
Always stop the pump before filling.
VERY IMPORTANT :
Instructions for starting up the boiler for the first time after the
system is fully or partly drained :
NOTE:
Never replace a boiler in an existing system
without carefully rinsing the system first. Install a
sludge trap on the return pipe, very close to the
boiler.
If all the air is not bled naturally to an expansion vessel which opens
out onto the air, the system must include manual bleeder valves, in
addition to automatic bleeder valves with the capability to bleed the
system by themselves when it is operating. The manual bleeder
valves are used to bleed all the high points of the system and to
make sure that the filled system is free of air before the burner is
turned on.
General
Recommendations relating to the water system are contained in
BS. 5449 Pt. 2 and BS. 6880.
4.4 Sludge Removal
A tapped ø 2" hole with a plug has been provided on the bottom of
the front of the boiler. Fit a quarter-turn valve on the opening to
remove the sludge.
Sludge removal leads to the draining of large quantities of water, so
remember to refill the system after the operation.
586mm
150mm
2" tapped sludge
removal hole
VIS5060
5.
CHIMNEY CONNECTION
The high-performance features of modern boilers and their use in
specific conditions as a result of the advance in burner technology
(e.g. first-stage or low modulation range operation) lead to very low
flue gas temperatures (less than 160°C).
This requires :
-
Flue insulation.
-
the use of flue pipes designed to enable the flow of
condensates which may result from such operating modes,
in order to prevent damage to the chimney.
-
the installation of a draining tee at the foot of the chimney.
The use of a draught moderator is recommended as well.
5.1 Flue Size
Refer to applicable regulations while determining the size and height
of the flue. Please note that GTE boilers have pressurised and tight
furnaces and that the pressure at the outlet must not exceed 0 mbar,
unless special sealing precautions have been taken, for instance in
order to connect a static condenser.
Detailed recommendations relating to the design of flues for GAS
fired appliances are quoted in BS. 6644 and British Gas Publication
No. IM11, whilst BS. 5410 Pt. 3 similarly applies to OIL fired boilers.
8
Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
5.2 Connecting to the flue
The connection shall be removable, and offer minimum load losses,
i.e. it must be as short as possible with no sudden change in section.
Its diameter shall always be at least equal to that of the boiler outlet,
i.e. :
-
ø 450 mm for 14-16 sections
-
ø 500 mm for 17-20 sections
-
Boilers with 21-25 sections are supplied with a plain plate.
The maximum cutout dimensions are 500 x 700 mm.
Fit a measuring point (ø 10 mm hole) on the flue, in order to adjust
the burner (combustion check).
815mm
F
Ø
chimney
connection
586mm
586mm
K
VIS5061
GTE
14
15
16
17
18
19
20
21
22
23
24
25
ø
F (mm)
450
450
450
500
500
500
500
K (mm)
10
-19
-18
3
4
25
-24
-23*
-2*
-1*
20*
21*
plain
plate
plain
plate
plain
plate
plain
plate
Plain
plate
* Dimension representing the end of the 100 mm long chimney connection.
Note: with models 21, 22, 23, 24 and 25 a plain plate which requires cutting out is supplied without the 100 mm long chimney connection.
Ideal Viscount GTE -
Installation, Assembly & Servicing
9
ASSEMBLY
6.
ASSEMBLY OF VISCOUNT GTE BOILERS
IMPORTANT
Important : Assemble the boiler in the
order given by the numbers of each figure,
in compliance with all the instructions.
Packaging :
Before starting to assemble the boiler, refer to the table below to
check if you have received all the packages required.
Boiler Body and Accessories
GTE boiler Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Assembled boiler body (contents depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
Cleaning tool kit (contents depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
·
Boilers supplied with an assembled body: start assembly from figure 11
GTE boiler Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Frame (dimensions depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
Rear section
1
1
1
1
1
1
1
1
1
1
1
1
Normal intermediate section
9
10
11
12
13
14
14
15
16
17
18
19
Special intermediate section
3
3
3
3
3
3
4
4
4
4
4
4
Front section
1
1
1
1
1
1
1
1
1